Floor Joist blocked
Each Floor joist is blocked and foamed to keep air out of the space under the floor.
Rafters ready for foam board
The decking is complete and ready for installation of foam board.
First Layer of foam board
The first layer of foam board is applied and then covered with fire resistant foam for a final finished surface.
Final Product:
Air Tight and Thermally Resistant conditioned attic space.
